93 State
Massachusetts
This healthcare facility on a medical campus in Seattle was constructed with a requirement to retain all campus parking on-site and below grade, while supporting a calculated throughput of 150 vehicles per hour in and out of the garage during clinic hours. To meet both the spatial and throughput demands, we configured a custom Wöhr Multiparker 730 fully automated parking system spanning three levels of below-grade parking. The system uses 176 parking pallets, 6 shuttles with turning devices, 5 lifts, and 5 transfer cabins with fast pallet exchange technology to achieve the required 150-car-per-hour throughput. It is also the first fully automated parking system on the West Coast with fully integrated EV charging built into the system. The installation provides 161 parking spaces within a 25,650-square-foot footprint, completed in March 2023.
For anyone considering a semi or fully automated parking solution, I would strongly recommend Harding Autopark Systems.
Jack R. MenashePresident, Ruben J. Menashe, Inc.

They care about us as a customer and meeting all of our installation and service needs. I highly recommended Harding Autopark Systems.
Robert BallCEO, Robert Ball Companies LLC

On our projects, Harding has brought a deep understanding of customer needs, design parameters, and constructibility.
Alex GriffithCOO, Branagh Development, Inc.

I found Harding Autopark Systems very accommodating and instrumental in providing a solution to our parking needs, design, budgeting, and value engineering.
Cameron ForoudPresident, John RCG
Their proactive approach ensured we were well coordinated between MEP systems and their suspended parking solution so that install was flawless. I look forward to working with Harding Autopark Systems again.
James StuekerjuergenLend Lease Construction

Beyond the track record of being able to deliver unique parking solutions in our market, the real value for GBD Architects was the quick response time we experienced during a very iterative design process.
Agustin Enriquez VAIA, Principal, GBD Architects Inc.

We chose Harding Autopark Systems initially because of their willingness to educate us on mechanical parking systems and to work with our design team. We are happy with how the process went and the product that we received.
Ryan ScheraDevelopment Manager, Deacon Development, LLC
Maximize your space and streamline access with our fully automated car elevator systems.
Book a Free Discovery Call